New Hilton Hotel to open summer 2018 celebrates with “topping off” ceremony

“In this building, the last structural element is concrete,” said Michael Rankin, president and CEO of the project’s Nashville-based contractor Crain Construction. “It’s kind of challenging to pour concrete and have everyone watch that as the celebratory milestone,” he continued, before inviting guests who had donned hard-hats to watch the flag descend from the top floor.

Read entire article via the following link:

https://franklinhomepage.com/new-hilton-hotel-to-open-summer-2018-celebrates-with-topping-off-ceremony/